Home   Grades   Galleries  

Archive for November, 2007

Some Important Dates

November 26th, 2007 by pspiller | No Comments | Filed in 3-D Design (general), Adv 3-D Design, Beg 3-D Design, Ceramics

As the semester winds down, and the ceramics portion of 3-D Design comes to a close, here are some very important dates to remember.

  • Nov 28- Glaze fire at the end of the day
  • Dec 7- Last day to finish projects to greenware (last bisque will be that weekend)
  • Dec 12- Last Glaze fire (all projects should be to completion)
  • Dec 13- Student show and sale
  • Dec 17- Last chance to turn in any projects.
  • Dec 18-20- Final exams
  • Dec 21- No school

Bisque for the holidays

November 19th, 2007 by pspiller | No Comments | Filed in 3-D Design (general), Adv 3-D Design, Beg 3-D Design, Ceramics

The kiln is bisque firing today (monday)   it will be done and unloaded for parent shadow day on Wednesday.   Lots of good projects.    We still have a long way to go and only a little time to get done,   so stay busy,  and stay focused.

Semester 1 project list

November 14th, 2007 by pspiller | No Comments | Filed in 3-D Design (general), Beg 3-D Design, Ceramics

Here is the final project list for the semester for beg ceramics

  • Pinch Pots
  • Pinch Vase (ec)
  • Clay Guardian
  • Coil Pot
  • 2-Slab Mugs
  • 3-thrown Object
  • ClayWhistle(ec)
  • Rain Stick
  • Extra-credit Assignment TBA
  • Clay Stamps (ec)

Grading Period 2

November 10th, 2007 by pspiller | 1 Comment | Filed in 3-D Design (general), Adv 3-D Design, Beg 3-D Design

I will be submitting grades for the second progress report this weekend. Everyone seemed to be hard at work getting their projects ready and graded this week. Good Job! The following is what you were responsible for during this grading period.

  • All Homework assignments
  • Pinch Pot
    • Planning
    • Execution
    • Glazing
  • Clay Guardian
    • Bisque
    • Glaze
  • Coil Pot
    • Bisque

Keep in mind that all clay projects will need to be completed at the cut off day of this semester (tentatively December 13th). This means that all clay work will end on the day before this day. We have a lot to do and just a little time, so lets keep busy, and we will have great work to show for it.

Glaze Fire

November 8th, 2007 by pspiller | 1 Comment | Filed in 3-D Design (general), Adv 3-D Design, Beg 3-D Design

I will be unloading the glaze load in the kiln first thing in the morning on Friday. It will be important that you get any and all projects that are due this grading period graded today in order to be reflected on the grades that are due this weekend. I will be in my classroom after school to wrap up grading.

Welcome to The 3-D Design

November 8th, 2007 by pspiller | No Comments | Filed in 3-D Design (general)

Hello,

Welcome to the Grossmont High School 3-D design web. I hope it proves to be useful.